Our vision is to build safe, reliable water and wastewater systems that make everyday life better for people and communities, while caring for the environment we all share.

Phone:
573-686-4142
98 County Road 321
Poplar Bluff, MO 63901

Water System Improvements

Mill Spring, Missouri

This project included the construction of a new 1,100-foot-deep rock well, designed to provide a strong, reliable source of water for the system. Drilling to this depth helps ensure long-term water availability and quality for residents and businesses.

In addition, a new well house was built to properly protect and house the well equipment, along with a new booster pump station. The booster station will play a critical role in maintaining consistent water pressure and improving overall system performance throughout the distribution network.

New water main lines were installed and upgraded system components, including valves and connections, to improve flow, reliability, and long-term serviceability. These improvements help reduce the risk of leaks and service interruptions while strengthening the entire infrastructure for future growth.

#PersonsAndSonInc #MillSpringMO #WaterSystemUpgrade #InfrastructureImprovements #WaterDistribution #BoosterStation #WellDrilling #MissouriContractor #BuildingCommunities